Mercy Anderson Hospital
Cincinnati, OH - Concrete Restoration
Cincinnati, OH
- Three-tier precast concrete parking garage totaling 300,000 SF consisting of post-topped double tee panels supported on invert tee beams and perimeter “L” beams
- Completed repairs to DT flanges and webs, invert tee beams, perimeter “L” beams, and barrier walls
- Localized replacement of joints between adjacent DT panels with concrete infill slabs
- Installed protective traffic coating and corrosion inhibitor treatment over elevated levels
- Replaced expansion joints